<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Zachry Holdings, Inc.</title>
	<atom:link href="http://www.zhi.com/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.zhi.com</link>
	<description>Premiere San Antonio Construction Services</description>
	<lastBuildDate>Thu, 23 May 2013 21:51:21 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Zachry Holdings, Inc. sets company record for United Way contributions</title>
		<link>http://www.zhi.com/2013/04/zachry-holdings-sets-company-record-united-contributions/</link>
		<comments>http://www.zhi.com/2013/04/zachry-holdings-sets-company-record-united-contributions/#comments</comments>
		<pubDate>Mon, 15 Apr 2013 14:52:38 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1401</guid>
		<description><![CDATA[Each year Zachry employees join together to raise money for United Way. Employees in more than 350 Zachry sites and offices pledge to give, with many choosing specific agencies to receive their funds. The fall 2012 campaign broke company records with employee donations and Zachry’s dollar-for-dollar corporate match totaling $4,475,300. In comparison with 2011, Zachry [...]]]></description>
			<content:encoded><![CDATA[<p>Each year Zachry employees join together to raise money for United Way. Employees in more than 350 Zachry sites and offices pledge to give, with many choosing specific agencies to receive their funds. The fall 2012 campaign broke company records with employee donations and Zachry’s dollar-for-dollar corporate match totaling $4,475,300.</p>
<p>In comparison with 2011, Zachry employee participation went up 3 percent and the average contribution increased by more than $15 per person. Zachry’s theme of &#8220;building new realities&#8221; for those in need was felt both inside and outside the company.</p>
<p>Zachry takes part in United Way campaigns at all of their locations each year as part of a legacy of philanthropy and community investment, seeking to create meaningful opportunities that deliver a durable and purposeful impact. <strong></strong></p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2013/04/zachry-holdings-sets-company-record-united-contributions/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry wins long-term contract with large petrochemical company</title>
		<link>http://www.zhi.com/2013/04/zachry-wins-long-term-contract-large-petrochemical-company/</link>
		<comments>http://www.zhi.com/2013/04/zachry-wins-long-term-contract-large-petrochemical-company/#comments</comments>
		<pubDate>Mon, 15 Apr 2013 14:39:20 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1396</guid>
		<description><![CDATA[For nearly a year, Zachry’s Industrial Services Group has been working at a petrochemical plant in southern Louisiana performing tank maintenance and inspection work, and has recently been hired as the company’s primary facility-wide maintenance provider. This site, which makes fuel and lube additives, needed a team focused on efficient and safe mechanical and soft [...]]]></description>
			<content:encoded><![CDATA[<p>For nearly a year, Zachry’s Industrial Services Group has been working at a petrochemical plant in southern Louisiana performing tank maintenance and inspection work, and has recently been hired as the company’s primary facility-wide maintenance provider. This site, which makes fuel and lube additives, needed a team focused on efficient and safe mechanical and soft craft maintenance work. Zachry was chosen for this long-term maintenance contract. Zachry leadership has already introduced on-site employees to the company and encouraged them to become part of the team. The transition to Zachry as full maintenance provider will be completed in April 2013.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2013/04/zachry-wins-long-term-contract-large-petrochemical-company/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry recognized for United Way campaigns across the country</title>
		<link>http://www.zhi.com/2013/04/zachry-recognized-united-campaigns-country/</link>
		<comments>http://www.zhi.com/2013/04/zachry-recognized-united-campaigns-country/#comments</comments>
		<pubDate>Mon, 15 Apr 2013 14:29:39 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1394</guid>
		<description><![CDATA[As Zachry’s 2012 United Way efforts came to a close and results were evaluated, United Way chapters from various areas nationwide began acknowledging Zachry for positive and effective campaigns. Zachry’s efforts were recognized at several sites and offices. The United Way of Warren County posted a banner in downtown Fort Royal, Va. honoring Zachry’s United [...]]]></description>
			<content:encoded><![CDATA[<p>As Zachry’s 2012 United Way efforts came to a close and results were evaluated, United Way chapters from various areas nationwide began acknowledging Zachry for positive and effective campaigns.</p>
<p>Zachry’s efforts were recognized at several sites and offices. The United Way of Warren County posted a banner in downtown Fort Royal, Va. honoring Zachry’s United Way efforts. United Way of Calhoun County, Texas recognized the contributions of Zachry employees at the INEOS Nitriles petrochemical facility; while The United Way of Muscatine, Iowa presented Zachry employees at the Monsanto plant with the honor of “Top Ten Con­tributor” for exceeding overall contributions by 48 percent from last year.</p>
<p>Zachry’s Industrial Services Group at the International Paper Domino plant has received recognition as a top five contributor from the United Way of Greater Texarkana, Texas. The United Way of Southeastern Connecticut has recognized Zachry Nuclear Engineer­ing, awarding Zachry representatives with the “Campaign Committee of the Year” award and the “Campaign Breakthrough” award for exemplifying philanthropic leader­ship by leading the community in giving, spirit, and compassion in a campaign that ex­ceeded $100,000.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2013/04/zachry-recognized-united-campaigns-country/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Engineering Main Design Center moves to larger office space</title>
		<link>http://www.zhi.com/2013/04/zachry-engineering-main-design-center-moves-larger-office-space/</link>
		<comments>http://www.zhi.com/2013/04/zachry-engineering-main-design-center-moves-larger-office-space/#comments</comments>
		<pubDate>Mon, 15 Apr 2013 14:09:05 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1387</guid>
		<description><![CDATA[Zachry engineers in Denver, Colo. will soon enjoy a full office floor to themselves at Zachry’s new Denver Design Center location. Previously, Zachry Engineering employees were spread across four floors in a different building. The move is expected to increase efficiency and give Zachry employees better resources to work as a collaborative force. Remodeling of [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry engineers in Denver, Colo. will soon enjoy a full office floor to themselves at Zachry’s new Denver Design Center location. Previously, Zachry Engineering employees were spread across four floors in a different building. The move is expected to increase efficiency and give Zachry employees better resources to work as a collaborative force.</p>
<p>Remodeling of the new Design Center’s new office space began several months ago and was completed in April 2013. Many employees have already been transferred with the remainder moving in the coming weeks. Zachry will occupy the fifth floor of this 11-story building, owned by the Denver Post and located at 101 West Colfax Avenue, Denver, CO 80202. Phone and fax numbers remain the same.</p>
<p>Zachry Engineering Corporation provides engineering and project management services to customers in the power, emerging energy, transportation, and food and beverage industries. Operating seven Design Centers throughout the country, the Denver, Colorado-based organization offers everything from engineering to startup.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2013/04/zachry-engineering-main-design-center-moves-larger-office-space/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Industrial, Inc. and Zachry Engineering Corporation awarded BASF project in Freeport</title>
		<link>http://www.zhi.com/2013/01/zachry-industrial-zachry-engineering-corporation-awarded-basf-project-freeport/</link>
		<comments>http://www.zhi.com/2013/01/zachry-industrial-zachry-engineering-corporation-awarded-basf-project-freeport/#comments</comments>
		<pubDate>Mon, 21 Jan 2013 18:41:40 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1361</guid>
		<description><![CDATA[Zachry Industrial and Zachry Engineering have been awarded a contract to design and build a new production plant for emulsion polymers at BASF’s integrated &#8220;Verbund&#8221; site in Freeport, Texas. The new plant, which is expected to begin production in mid-2014, will create approximately 25 new jobs at the Freeport site. “This project reflects our EPC capabilities [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry Industrial and Zachry Engineering have been awarded a contract to design and build a new production plant for emulsion polymers at BASF’s integrated &#8220;Verbund&#8221; site in Freeport, Texas. The new plant, which is expected to begin production in mid-2014, will create approximately 25 new jobs at the Freeport site.</p>
<p>“This project reflects our EPC capabilities for the process industries and will strengthen our relationship with BASF, a leader in the global chemicals industry,” said Bruce Chamrad, director of business development for Zachry. “We are excited to continue our work with BASF, and to expand our presence and investment in the Freeport community.”</p>
<p>The new plant will serve the coatings, construction, adhesives and paper industries, and will manufacture acrylic emulsion polymers used for architectural coatings, construction chemicals, adhesives, and the paper chemicals industry.</p>
<p>“We are excited to help BASF bring their ‘Verbund’ concept to another location,” said Scott Duffy, senior vice president for Zachry. “Using our integrated EPC approach and direct-hire construction model, we will assist BASF in their goals to safely enhance their production site; maximize the production efficiencies of acrylic dispersions; and reduce waste and emissions.”</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2013/01/zachry-industrial-zachry-engineering-corporation-awarded-basf-project-freeport/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Engineering’s Nacogdoches Generating Facility wins Best Bioenergy Project of the Year for Power Engineering Magazine</title>
		<link>http://www.zhi.com/2013/01/zachry-engineerings-nacogdoches-generating-facility-wins-bioenergy-project-year-power-engineering-magazine/</link>
		<comments>http://www.zhi.com/2013/01/zachry-engineerings-nacogdoches-generating-facility-wins-bioenergy-project-year-power-engineering-magazine/#comments</comments>
		<pubDate>Mon, 21 Jan 2013 18:34:16 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1359</guid>
		<description><![CDATA[The Nacogdoches Generating Facility, engineered by Zachry Engineering and owned by Southern Co., was named The Best Bioenergy Project of the Year by Power Engineering Magazine, announced at the annual POWER-GEN International conference in Dec., 2012. The detailed engineering and design services for this 100-MW greenfield biomass project included plant layout; detailed balance of plant [...]]]></description>
			<content:encoded><![CDATA[<p>The Nacogdoches Generating Facility, engineered by Zachry Engineering and owned by Southern Co., was named The Best Bioenergy Project of the Year by Power Engineering Magazine, announced at the annual POWER-GEN International conference in Dec., 2012.</p>
<p>The detailed engineering and design services for this 100-MW greenfield biomass project included plant layout; detailed balance of plant (BOP) engineering; procurement specifications; technical bid evaluation; field engineering; checkout, startup and training; and as-built documentation.</p>
<p>“This was a great honor,” said Peter Quist. “We are pleased with the success of the project, and look forward to designing more technologically advanced biomass projects in the future. Many thanks go to our skilled engineers, the craft workers on site and Southern Co.”</p>
<p>Construction began in late 2009, with the unit being turned over for commercial operation in 2012. The plant is currently the largest single unit biomass facility in North America. The woody biomass plant uses a bubbling fluidized bed boiler (BFB); selective non-catalytic reduction (SNCR); and an axial flow steam turbine and condenser.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2013/01/zachry-engineerings-nacogdoches-generating-facility-wins-bioenergy-project-year-power-engineering-magazine/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Holdings, Inc. grows Southeast presence with purchase of industrial fabrication facility</title>
		<link>http://www.zhi.com/2012/10/zachry-holdings-grows-southeast-presence-purchase-industrial-fabrication-facility/</link>
		<comments>http://www.zhi.com/2012/10/zachry-holdings-grows-southeast-presence-purchase-industrial-fabrication-facility/#comments</comments>
		<pubDate>Fri, 12 Oct 2012 16:36:52 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1342</guid>
		<description><![CDATA[Zachry Holdings, Inc. will further expand its presence in the Southeastern U.S. with the purchase of a large industrial fabrication facility in Moss Point, Miss.,  from Day &#38; Zimmermann (D&#38;Z). The facility fabricates piping systems and vessels for large projects in the power, petrochemical, refining, forest products and other markets.   “With the support and leadership [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry Holdings, Inc. will further expand its presence in the Southeastern U.S. with the purchase of a large industrial fabrication facility in Moss Point, Miss.,  from Day &amp; Zimmermann (D&amp;Z). The facility fabricates piping systems and vessels for large projects in the power, petrochemical, refining, forest products and other markets.  </p>
<p>“With the support and leadership of Jackson County and the City of Moss Point, we are happy to begin our transition into the Moss Point facility, which will strategically serve the southeast region with our enhanced fabrication capabilities,” Kirk McDonald, Zachry Executive Vice President said. “The area is ideal in regard to our plans for growth, increased employment and proximity to many of our jobs sites and customers.”</p>
<p>Zachry has had a continuous presence in the area for nearly 10 years through the Moss Point Employment Center and a maintenance contract with Chevron, in nearby Pascagoula. Zachry enjoys partnerships with several area non-profit organizations such as the local Salvation Army Angel Tree, American Cancer Society, C.A.S.A., Daily Bread and March of Dimes.</p>
<p>“The Jackson County Economic Development Foundation (JCEDF) welcomes Zachry Industrial again to Moss Point as they add their newest facility to Jackson County. No stranger to the area, Zachry is familiar with our local industry, business climate, labor availability and public-private approach to economic development,” George Freeland, executive director of JCEDF said. “Community and government leaders including Moss Point Mayor Aneice Liddell, the Moss Point Board of Alderman, and the Jackson County Board of Supervisors all worked diligently to bring Zachry to this location. We look forward to continued investments in the facility and the increased employment it will bring to the community.”</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2012/10/zachry-holdings-grows-southeast-presence-purchase-industrial-fabrication-facility/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Holdings, Inc. acquires JVIC</title>
		<link>http://www.zhi.com/2012/10/zachry-holdings-acquires-jvic/</link>
		<comments>http://www.zhi.com/2012/10/zachry-holdings-acquires-jvic/#comments</comments>
		<pubDate>Tue, 02 Oct 2012 14:50:54 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1328</guid>
		<description><![CDATA[Zachry Holdings, Inc. announced today that it has completed the acquisition of JV Industrial Companies, a Houston-based industry leader serving clients primarily in the refining and petrochemicals sector. JVIC provides Fortune 500 companies turnkey solutions for their turnaround, maintenance, repair and related facility requirements. “Expanding Zachry’s capabilities to cover the full spectrum of services required [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry Holdings, Inc. announced today that it has completed the acquisition of JV Industrial Companies, a Houston-based industry leader serving clients primarily in the refining and petrochemicals sector. JVIC provides Fortune 500 companies turnkey solutions for their turnaround, maintenance, repair and related facility requirements.</p>
<p>“Expanding Zachry’s capabilities to cover the full spectrum of services required by customers in our core markets is a major element of our strategy. This acquisition represents a major step forward on that path,” said John Zachry, CEO of Zachry Holdings, Inc. “JVIC is an impressive and well-managed company. Our customers will benefit from expanded and enhanced services and our employees will benefit from the additional career opportunities.”</p>
<p>The combination of these highly complementary businesses will result in one of the largest organizations dedicated to serving U.S.-based energy and industrial clients. With a workforce of more than 20,000, Zachry will provide a wide range of services including engineering, construction, maintenance, turnarounds and fabrication, as well as a number of highly specialized services. The company will operate in close to 350 sites nationwide.</p>
<p>Houlihan Lokey served as exclusive financial advisor to ZHI.</p>
<p><strong>A</strong><strong>bout Zachry Holdings, Inc.<br />
</strong>Zachry Holdings, Inc. is a privately held business engaged primarily in the engineering, construction, and maintenance of large industrial facilities in the United States.  Based in San Antonio, Texas, the company serves a broad range of industry sectors including fossil &#038; renewable power generation, petrochemical, refining, forest products, food &#038; beverage, pharmaceutical and nuclear. Visit <a href="http://www.zhi.com/">www.zhi.com</a> for more information.</p>
<p><strong>About JVIC</strong></p>
<p>Founded in 1998, privately held JVIC provides industrial clients with best-class turnaround, construction, engineering and fabrication services.  The company has 20 office locations throughout the United States, and offers services to customers in the refining, petrochemical, midstream oil and gas, forest products and fertilizer/ammonia markets.  Visit <a href="http://www.jvic.com/">www.jvic.com</a> for more information.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2012/10/zachry-holdings-acquires-jvic/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Industrial, Inc. awarded LG&amp;E’s Mill Creek Retrofit projects</title>
		<link>http://www.zhi.com/2012/09/zachry-industrial-awarded-lges-mill-creek-retrofit-projects/</link>
		<comments>http://www.zhi.com/2012/09/zachry-industrial-awarded-lges-mill-creek-retrofit-projects/#comments</comments>
		<pubDate>Tue, 18 Sep 2012 15:14:30 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1320</guid>
		<description><![CDATA[Zachry Industrial, Inc. was awarded a contract from Louisville Gas &#38; Electric (LG&#38;E) and Kentucky Utilities (KU) for the Engineering, Procurement and Construction retrofit of the Mill Creek Generating Station, located in Louisville, Kentucky. On-site mobilization is set for September 2012, and work is expected to continue through 2016. The project team will consist of [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry Industrial, Inc. was awarded a contract from Louisville Gas &amp; Electric (LG&amp;E) and Kentucky Utilities (KU) for the Engineering, Procurement and Construction retrofit of the Mill Creek Generating Station, located in Louisville, Kentucky. On-site mobilization is set for September 2012, and work is expected to continue through 2016.</p>
<p>The project team will consist of more than 600 employees at peak.  Zachry’s Design Center in Denver, Colo. will provide the engineering and design. Most recently, Zachry’s work with LG&amp;E/KU includes the E. W. Brown Unit 3 Selective Catalytic Reduction Project, scheduled for completion in December 2012.</p>
<p>The Mill Creek scope includes a retrofit of Units 1 &amp;2 with new ductwork; new Pulse Jet Fabric Filters (PJFF); four new booster fans; a single new Wet Flue Gas Desulfurization (WFGD) system; a new chimney; BOP support systems; and electrical/controls.</p>
<p>On Unit 3 Zachry will demolish the existing Unit 3 WFGD, and furnish and install new ductwork; new PJFF and BOP support systems; new ID Fans; and modified electrical/controls. The existing Unit 4 WFDG will be modified and tied in for use with Unit 3. The retrofit scope for Unit 4 includes a new PJFF; new booster fans; a new WFGD; and a new chimney.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2012/09/zachry-industrial-awarded-lges-mill-creek-retrofit-projects/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Industrial, Inc. awarded long-term maintenance contract with INEOS Nitriles</title>
		<link>http://www.zhi.com/2012/09/zachry-industrial-awarded-long-term-maintenance-contract-ineos-nitriles/</link>
		<comments>http://www.zhi.com/2012/09/zachry-industrial-awarded-long-term-maintenance-contract-ineos-nitriles/#comments</comments>
		<pubDate>Tue, 18 Sep 2012 15:08:06 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1316</guid>
		<description><![CDATA[Zachry Industrial, Inc. was awarded a multi-year contract for maintenance work for INEOS Nitriles at their Green Lake, Texas plant location. Zachry retains maintenance contracts at two other INEOS locations and has performed capital work at Green Lake in the past. This is the first contract in the INEOS Nitriles division for Zachry’s Industrial Services [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry Industrial, Inc. was awarded a multi-year contract for maintenance work for INEOS Nitriles at their Green Lake, Texas plant location. Zachry retains maintenance contracts at two other INEOS locations and has performed capital work at Green Lake in the past. This is the first contract in the INEOS Nitriles division for Zachry’s Industrial Services Group.</p>
<p>Zachry will perform maintenance and reliability services; complete turnarounds; and support capital work for the Green Lake facility. As Zachry transitions the site, they will retain skilled long-tenured employees already working at the plant, as well as hire additional craft to form a workforce of around 60 people.  </p>
<p>The Zachry team plans to mobilize at the Green Lake in early October 2012. The plant produces 545,000 tons of acrylonitrile per year, and also produces acetonitrile, HCN and ACH. The facility retains the designation of an OSHA Voluntary Protection Program &#8220;Star&#8221; site, adding to Zachry’s 14 other sites that hold the designation. OSHA names the Star sites each year to those that ensure the highest standard of health and safety practices.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2012/09/zachry-industrial-awarded-long-term-maintenance-contract-ineos-nitriles/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Engineering expands power supply to the Texas Panhandle</title>
		<link>http://www.zhi.com/2012/04/zachry-engineering-expands-power-supply-texas-panhandle/</link>
		<comments>http://www.zhi.com/2012/04/zachry-engineering-expands-power-supply-texas-panhandle/#comments</comments>
		<pubDate>Mon, 23 Apr 2012 13:33:21 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1274</guid>
		<description><![CDATA[Xcel Energy has hired Zachry Engineering Corporation for the design of their second phase expansion at the Jones Power Station near Lubbock, Texas. This is the second design contract awarded for Zachry Engineering at the Jones Station where 170-MW gas turbine-generator units are being added in phases to supply peaking power. Fast starting peaking gas [...]]]></description>
			<content:encoded><![CDATA[<p>Xcel Energy has hired Zachry Engineering Corporation for the design of their second phase expansion at the Jones Power Station near Lubbock, Texas. This is the second design contract awarded for Zachry Engineering at the Jones Station where 170-MW gas turbine-generator units are being added in phases to supply peaking power. Fast starting peaking gas turbines meet consumer needs and provide system stability during high demand periods and during sudden changes in power output from wind and solar plants. This is the second peaking gas turbine to be added at the site. Eventually the two gas turbines will be converted to a combined cycle power plant with a rating of about 550 megawatts. The units being added at the Jones Station use natural gas fuel and meet all of the stringent emissions regulations for new power plants. Gas turbines have been a strong part of the Zachry Engineering design experience and this new unit will add to the portfolio of more than 28,000 megawatts. The design effort started in late 2011 is expected to be completed in late 2012.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2012/04/zachry-engineering-expands-power-supply-texas-panhandle/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Nuclear Engineering chosen to engineer Seabrook Nuclear Station</title>
		<link>http://www.zhi.com/2012/04/zachry-nuclear-engineering-chosen-engineer-seabrook-nuclear-station/</link>
		<comments>http://www.zhi.com/2012/04/zachry-nuclear-engineering-chosen-engineer-seabrook-nuclear-station/#comments</comments>
		<pubDate>Mon, 23 Apr 2012 13:31:27 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1270</guid>
		<description><![CDATA[Zachry Nuclear Engineering Inc. has signed a contract with NextEra Energy Seabrook to provide engineering, design and licensing support services for the preparation of horizontal storage module (HSM) expansion for dry fuel storage at the Seabrook Nuclear Station. The Seabrook Dry Fuel Storage Project is preparing for its second loading campaign in 2013. These preparations [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry Nuclear Engineering Inc. has signed a contract with NextEra Energy Seabrook to provide engineering, design and licensing support services for the preparation of horizontal storage module (HSM) expansion for dry fuel storage at the Seabrook Nuclear Station. The Seabrook Dry Fuel Storage Project is preparing for its second loading campaign in 2013. These preparations include the expansion of the existing 8 HSM array arranged in a back-to-back orientation to a 16 HSM array. Zachry Nuclear Engineering is a full services engineering firm that provides engineering, design and project management services to the operating nuclear fleet. </p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2012/04/zachry-nuclear-engineering-chosen-engineer-seabrook-nuclear-station/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry awarded CPChem complex expansion</title>
		<link>http://www.zhi.com/2012/03/zachry-awarded-cpchem-complex-expansion/</link>
		<comments>http://www.zhi.com/2012/03/zachry-awarded-cpchem-complex-expansion/#comments</comments>
		<pubDate>Mon, 12 Mar 2012 17:29:42 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1175</guid>
		<description><![CDATA[Zachry has been selected to serve as the contractor for the CPChem Complex NGL (Natural Gas Liquefaction) Expansion Project in Sweeny, Texas. Zachry will work with CPChem and Zachry maintenance employees to complete the project within the operating plant. The $10 million-plus job will mobilize approximately 100 people beginning in spring 2012. The work includes [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry has been selected to serve as the contractor for the CPChem Complex NGL (Natural Gas Liquefaction) Expansion Project in Sweeny, Texas. Zachry will work with CPChem and Zachry maintenance employees to complete the project within the operating plant.</p>
<p>The $10 million-plus job will mobilize approximately 100 people beginning in spring 2012. The work includes adding piping and electrical and setting equipment at the plant, requiring a number of turnarounds. The NGL expansion is expected to be completed in the first quarter of 2013.</p>
<p>CPChem is a longtime Zachry customer, with contracts dating back two decades. This is the first construction contract awarded after the formation of Zachry Industrial’s Regional Projects Group.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2012/03/zachry-awarded-cpchem-complex-expansion/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Industrial, Inc. awarded FLNG project in joint venture with CB&amp;I</title>
		<link>http://www.zhi.com/2012/03/zachry-industrial-awarded-flng-project-joint-venture-cbi/</link>
		<comments>http://www.zhi.com/2012/03/zachry-industrial-awarded-flng-project-joint-venture-cbi/#comments</comments>
		<pubDate>Mon, 12 Mar 2012 17:14:51 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1172</guid>
		<description><![CDATA[Zachry Industrial, Inc. and CB&#38;I were awarded the FEED (front-end engineering and design) contract for the engineering and design of the Freeport Liquefaction Project near Freeport, Texas.  Zachry and CB&#38;I will engineer and design three LNG liquefaction trains (each rated at 4.4 million tons per year (mtpa)) and corresponding pretreatment facilities to be located near [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry Industrial, Inc. and CB&amp;I were awarded the FEED (front-end engineering and design) contract for the engineering and design of the Freeport Liquefaction Project near Freeport, Texas.  Zachry and CB&amp;I will engineer and design three LNG liquefaction trains (each rated at 4.4 million tons per year (mtpa)) and corresponding pretreatment facilities to be located near the existing Freeport LNG Regasification Terminal.</p>
<p>Within the three-train design, the Zachry CB&amp;I JV will develop a fixed price/fixed schedule EPC proposal for both a one-train initial development and a two-train initial development, giving Freeport LNG the ability to choose the size of the initial project phase based on customer demand. The FEED, set for completion in late 3<sup>rd</sup> quarter 2012, will set the stage for mobilization, likely in 1<sup>st</sup> quarter 2013.</p>
<p>As the constructor of the original LNG plant, Zachry has significant experience in the LNG industry as well as large capital experience in the region. Zachry will continue its legacy of hiring a local workforce from the Gulf Coast area and continue to build on its long history of community involvement, seeking to create meaningful volunteer opportunities that deliver a durable and purposeful impact. Zachry has already completed several community service endeavors in Brazoria and the surrounding counties, including: Boys and Girls Club in Brazoria County; 4H; Brazoria County Youth Homes; and more.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2012/03/zachry-industrial-awarded-flng-project-joint-venture-cbi/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Nuclear Engineering, Inc. acquires NAI</title>
		<link>http://www.zhi.com/2012/02/zachry-nuclear-engineering-acquires-numerical/</link>
		<comments>http://www.zhi.com/2012/02/zachry-nuclear-engineering-acquires-numerical/#comments</comments>
		<pubDate>Mon, 20 Feb 2012 17:04:51 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1166</guid>
		<description><![CDATA[Stonington, Conn.-based Zachry Nuclear Engineering, Inc. has acquired industry-leading software producer and engineering services provider, Numerical Applications, Inc. (NAI). NAI provides a wide spectrum of engineering analysis services including thermal hydraulic, radiological, chemical and safety solutions, and is the leading developer of nuclear software such as GOTHIC™, CentralStor™ and RADTRAD-NAI™ “We are excited to welcome [...]]]></description>
			<content:encoded><![CDATA[<p>Stonington, Conn.-based Zachry Nuclear Engineering, Inc. has acquired industry-leading software producer and engineering services provider, Numerical Applications, Inc. (NAI). NAI provides a wide spectrum of engineering analysis services including thermal hydraulic, radiological, chemical and safety solutions, and is the leading developer of nuclear software such as GOTHIC™, CentralStor™ and RADTRAD-NAI™</p>
<p>“We are excited to welcome NAI into the Zachry Nuclear family,” said Mark Mills, president of Zachry Nuclear Engineering. “Their analytical and software development capabilities complement Zachry’s analysis, software, design and full EPC nuclear offerings.”</p>
<p>Numerical Applications, a division of Zachry Nuclear Engineering, Inc. will expand Zachry’s  geographic footprint, with offices from Washington to the Carolinas, while giving NAI access to the broad resources of San Antonio-based engineering, construction and maintenance provider Zachry Holdings, Inc.</p>
<p>“I truly believe that synergy of the combined organizations will allow us to better support our customers, as we embrace the vision, expand the capabilities and employ the resources that Zachry offers,” said NAI President Dr. Tom George.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2012/02/zachry-nuclear-engineering-acquires-numerical/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry awarded TECO FGD Fines Upgrade Big Bend Station project</title>
		<link>http://www.zhi.com/2012/02/zachry-awarded-teco-fgd-fines-upgrade-big-bend-station-project-2/</link>
		<comments>http://www.zhi.com/2012/02/zachry-awarded-teco-fgd-fines-upgrade-big-bend-station-project-2/#comments</comments>
		<pubDate>Mon, 20 Feb 2012 17:01:02 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1162</guid>
		<description><![CDATA[Zachry has been selected to serve as the contractor for the TECO (Tampa Electric Co.) FGD Fines Upgrade Big Bend Station project located in Apollo Beach, Florida. Mobilization took place in November 2011, with a target completion date of August 2012. The project will upgrade the TECO Fines Dewatering System to achieve moisture content at [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry has been selected to serve as the contractor for the TECO (Tampa Electric Co.) FGD Fines Upgrade Big Bend Station project located in Apollo Beach, Florida. Mobilization took place in November 2011, with a target completion date of August 2012.</p>
<p>The project will upgrade the TECO Fines Dewatering System to achieve moisture content at less than 10 percent. The scope includes the removal of two existing fines filter press equipment systems; the expansion of the existing fines filter structure; the installation of two new horizontal belt filter systems, including pumps, motors, tanks, and accessories; and the installation of two new clarifier tanks and five pump skids.</p>
<p>The job includes removal of existing media filter equipment; installation of new media filters and interconnecting piping; installation of one clarifier overflow tank and interconnecting piping; civil site work, including paving &amp; storm water drainage; installation of one motor control center; and installation of eight variable frequency drives.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2012/02/zachry-awarded-teco-fgd-fines-upgrade-big-bend-station-project-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry completes 2011 United Way Campaign</title>
		<link>http://www.zhi.com/2012/02/zachry-completes-2011-united-campaign/</link>
		<comments>http://www.zhi.com/2012/02/zachry-completes-2011-united-campaign/#comments</comments>
		<pubDate>Wed, 01 Feb 2012 16:14:14 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1155</guid>
		<description><![CDATA[Zachry completed their 2011 campaign with high marks. On average, each employee gave more than $275 toward United Way in their communities, in addition to their hours of volunteer efforts each year. Monetary contributions increased this year from 2010 by almost $18 per person. From the Home Office in San Antonio, Texas to job sites [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry completed their 2011 campaign with high marks. On average, each employee gave more than $275 toward United Way in their communities, in addition to their hours of volunteer efforts each year. Monetary contributions increased this year from 2010 by almost $18 per person.</p>
<p>From the Home Office in San Antonio, Texas to job sites nationwide, each campaign was conducted with the same goal and theme, “give an hour, change a life.” This year’s theme represents the strong impact of giving back, and embodies the Zachry value of service that has been in place for three generations.</p>
<p>The team would like to extend a special thank you to all the employees, coordinators and especially the United Way agencies themselves, for allowing Zachry to make a difference. Watch for updates on Facebook/ZachryHoldings as United Way kicks off in fall 2012.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2012/02/zachry-completes-2011-united-campaign/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Nuclear, Inc. selected by Florida Power &amp; Light for construction modifications at Turkey Point Nuclear Plant</title>
		<link>http://www.zhi.com/2012/02/zachry-nuclear-selected-florida-power-light-construction-modifications-turkey-point-nuclear-plant/</link>
		<comments>http://www.zhi.com/2012/02/zachry-nuclear-selected-florida-power-light-construction-modifications-turkey-point-nuclear-plant/#comments</comments>
		<pubDate>Wed, 01 Feb 2012 16:09:12 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1148</guid>
		<description><![CDATA[Zachry Nuclear, Inc., a subsidiary of engineering, construction and maintenance provider, Zachry Holdings, Inc. was chosen by long-time customer Florida Power &#38; Light (FPL) to construct intake structure modifications at their Turkey Point Nuclear Plant near Homestead, Fla. The construction services will take place during the refueling outages of Units 3 and 4, and are [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry Nuclear, Inc., a subsidiary of engineering, construction and maintenance provider, Zachry Holdings, Inc. was chosen by long-time customer Florida Power &amp; Light (FPL) to construct intake structure modifications at their Turkey Point Nuclear Plant near Homestead, Fla. The construction services will take place during the refueling outages of Units 3 and 4, and are set to commence this year, with a completion expected in early 2013. Pre-outage work began in fall 2011.</p>
<p>The scope of work to be done by the design/construct firm includes a replacement of the traveling water screens and cathodic protection system with new state-of-the-art systems and equipment. Additional modifications will take place to support the new system structure.</p>
<p>“Zachry has been providing nuclear reliability, regulatory and modernization service solutions to the nuclear industry for more than three decades,” said Tom Hannigan, president, Zachry Nuclear, Inc. “We are proud to carry on this tradition of excellence while we build our relationship with Florida Power &amp; Light and perform necessary construction services on one of the most vital pieces of American energy infrastructure.”</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2012/02/zachry-nuclear-selected-florida-power-light-construction-modifications-turkey-point-nuclear-plant/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry awarded Merck Fill Line Relocation</title>
		<link>http://www.zhi.com/2011/12/zachry-awarded-merck-fill-line-relocation/</link>
		<comments>http://www.zhi.com/2011/12/zachry-awarded-merck-fill-line-relocation/#comments</comments>
		<pubDate>Mon, 12 Dec 2011 16:01:43 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1133</guid>
		<description><![CDATA[Zachry has been selected to serve as the contractor for the Merck Fill Line Relocation, in Cleveland, Tenn. Zachry will work directly with the construction manager for Merck, and longtime Zachry customer, Yonkers Industries. The $1 million-plus job, awarded in October 2011 will take place at a Merck and Schering/Plough packaging facility that manufactures well-known [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry has been selected to serve as the contractor for the Merck Fill Line Relocation, in Cleveland, Tenn. Zachry will work directly with the construction manager for Merck, and longtime Zachry customer, Yonkers Industries.</p>
<p>The $1 million-plus job, awarded in October 2011 will take place at a Merck and Schering/Plough packaging facility that manufactures well-known products such as Claritin, Coppertone and Dr. Scholls merchandise. </p>
<p>Zachry was awarded the architectural package to relocate a product packaging line from a Merck facility in New Jersey. The design work schedule will coordinate with the relocation of the equipment so as not to affect the startup of the new Claritin packaging line. </p>
<p>The construction portion of the job includes interior demolition and renovation of existing facilities; closing old/creating new door openings; installing new metal studs and drywall; masonry, hollow metal doors and hardware; overhead coiling doors; painting and acoustical ceiling systems. </p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2011/12/zachry-awarded-merck-fill-line-relocation/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry to Exhibit at POWER-GEN International</title>
		<link>http://www.zhi.com/2011/12/zachry-exhibit-power-gen-international/</link>
		<comments>http://www.zhi.com/2011/12/zachry-exhibit-power-gen-international/#comments</comments>
		<pubDate>Mon, 12 Dec 2011 15:56:51 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1130</guid>
		<description><![CDATA[Zachry exhibited at POWER-GEN International in Las Vegas, Nevada, Tuesday Dec. 13 – Dec. 15 at Booth C-3616. An active presenter for four years, Zachry showcased their full EPC, construction and engineering services in the power market, including gas generation, coal, biomass, solar and nuclear segments. POWER-GEN is the premiere conference/tradeshow for the power industry, [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry exhibited at POWER-GEN International in Las Vegas, Nevada, Tuesday Dec. 13 – Dec. 15 at Booth C-3616. An active presenter for four years, Zachry showcased their full EPC, construction and engineering services in the power market, including gas generation, coal, biomass, solar and nuclear segments.</p>
<p>POWER-GEN is the premiere conference/tradeshow for the power industry, providing comprehensive coverage of trends, technologies and issues facing the generation sector. More than 1,200 companies from all sectors of the industry exhibit each year and more than 19,000 attendees come together for a horizontal look at the industry with key emphasis on new solutions and innovations for the future. </p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2011/12/zachry-exhibit-power-gen-international/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Engineering supports shale gas exploration</title>
		<link>http://www.zhi.com/2011/10/zachry-engineering-supports-shale-gas-exploration/</link>
		<comments>http://www.zhi.com/2011/10/zachry-engineering-supports-shale-gas-exploration/#comments</comments>
		<pubDate>Wed, 26 Oct 2011 13:51:47 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1073</guid>
		<description><![CDATA[The recent take-off of the American shale gas market has opened opportunities for design, production and exploration in the industry. Zachry has been chosen by multiple leading frac sand supply companies to perform facility expansion designs at several locations across the nation.  Denver-Colo.-based Zachry Engineering is completing ongoing design services for multiple customers at many [...]]]></description>
			<content:encoded><![CDATA[<p>The recent take-off of the American shale gas market has opened opportunities for design, production and exploration in the industry. Zachry has been chosen by multiple leading frac sand supply companies to perform facility expansion designs at several locations across the nation. </p>
<p>Denver-Colo.-based Zachry Engineering is completing ongoing design services for multiple customers at many of their seven design centers. The projects include both line expansions and new facilities, and require material handling and application of special processing equipment. </p>
<p>“The Zachry Engineering Charlotte design center has long supported one of the largest frac sand producers in the U.S., and has vast experience in this specialty product business,” said Mike Morris, vice president of Zachry Engineering. “We are now applying our market knowledge at several locations for the major domestic producers.”</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2011/10/zachry-engineering-supports-shale-gas-exploration/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry wins Gold award for company-wide 401(k) Day</title>
		<link>http://www.zhi.com/2011/10/zachry-wins-gold-award-company-wide-401k-day/</link>
		<comments>http://www.zhi.com/2011/10/zachry-wins-gold-award-company-wide-401k-day/#comments</comments>
		<pubDate>Wed, 26 Oct 2011 13:46:07 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1068</guid>
		<description><![CDATA[For the second year in a row, Zachry has taken home an industry award for their 401(k) Day, an event geared toward enrolling employees in their corporate-match 401(k) plans, while also offering training, workshops and assistance to guide employees toward healthy financial futures. This year’s campaign, which was themed with Zachry-sponsored NASCAR racer David Starr [...]]]></description>
			<content:encoded><![CDATA[<p>For the second year in a row, Zachry has taken home an industry award for their 401(k) Day, an event geared toward enrolling employees in their corporate-match 401(k) plans, while also offering training, workshops and assistance to guide employees toward healthy financial futures.</p>
<p>This year’s campaign, which was themed with Zachry-sponsored NASCAR racer David Starr and the Zachry No. 81 Toyota, won the prestigious Gold Signature Award from the Profit Sharing Council of America (PSCA) for boosting 401(k) participation by 3.7 percent.</p>
<p>“We set a goal several years ago to win this, mostly because of what it would mean to our employees,” said Cynda Reznicek, director of compensation and benefits. “Hopefully, the real winners are employees who can turn their retirement dreams into reality.”</p>
<p>The campaign was a collaborative effort between several Zachry departments, including the 401(k) benefits group, ESD’s marketing department, benefits communications, Zachry NASCAR group and job site coordinators. Both Home Office and job site employees enjoyed Zachry’s in-house video, scripted and shot at the Home Office and featuring David Starr; educational classes on DVD, recorded in both English and Spanish; hardhat stickers; and prizes.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2011/10/zachry-wins-gold-award-company-wide-401k-day/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Nuclear Engineering, Inc. relocates Headquarters to Stonington, Conn.</title>
		<link>http://www.zhi.com/2011/09/zachry-nuclear-engineering-relocates-headquarters-stonington-conn/</link>
		<comments>http://www.zhi.com/2011/09/zachry-nuclear-engineering-relocates-headquarters-stonington-conn/#comments</comments>
		<pubDate>Fri, 16 Sep 2011 18:21:26 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1019</guid>
		<description><![CDATA[Zachry Nuclear Engineering, Inc. relocated its headquarters from Groton to Stonington, Conn. in August 2011, and commemorated the move with an Open House at their new location, 14 Lords Hill Road, on Sept. 15, 2011. “Our new facility allows us to retain and expand our staff here in Connecticut,” said Mark Mills, president of Zachry Nuclear [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry Nuclear Engineering, Inc. relocated its headquarters from Groton to Stonington, Conn. in August 2011, and commemorated the move with an Open House at their new location, 14 Lords Hill Road, on Sept. 15, 2011.</p>
<p>“Our new facility allows us to retain and expand our staff here in Connecticut,” said Mark Mills, president of Zachry Nuclear Engineering. “In keeping with the ongoing expansion of our Charlotte and Chicago offices, this is just one more indication of Zachry’s long-term commitment to the nuclear power industry.”</p>
<p>Zachry Nuclear Engineering is a full service engineering firm that provides engineering, design and project management services to the nuclear power industry. The professional staff of approximately 175 includes controls, electrical, mechanical, civil and structural engineers, drafters and designers that are skilled in power plant systems, engineering analysis and the unique requirements that apply to the nuclear power industry. Their offices are located in Stonington, Conn.; Charlotte, N.C.; and Chicago, Ill.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2011/09/zachry-nuclear-engineering-relocates-headquarters-stonington-conn/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Engineering continues design for leading agriculture, and food and beverage companies</title>
		<link>http://www.zhi.com/2011/09/zachry-engineering-continues-design-leading-agriculture-food-beverage-companies/</link>
		<comments>http://www.zhi.com/2011/09/zachry-engineering-continues-design-leading-agriculture-food-beverage-companies/#comments</comments>
		<pubDate>Fri, 16 Sep 2011 18:17:58 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1016</guid>
		<description><![CDATA[Zachry Engineering has been awarded multiple contracts for design of facilities for top agriculture and food &#38; beverage companies with plant locations from Nebraska to the Carolinas. Completed in Zachry’s nationwide design centers, the engineering work includes material handling, process support, production expansion and general facilities.  “The agriculture and food &#38; beverage industries are highly competitive, [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry Engineering has been awarded multiple contracts for design of facilities for top agriculture and food &amp; beverage companies with plant locations from Nebraska to the Carolinas. Completed in Zachry’s nationwide design centers, the engineering work includes material handling, process support, production expansion and general facilities. </p>
<p>“The agriculture and food &amp; beverage industries are highly competitive, and we have to earn the confidence and trust of our customers,” said Mike Morris, vice president of business development for Zachry Engineering. “We have a long history of work in these markets and have expanded our relationships with the most influential industry leaders in the United States.”</p>
<p>Zachry Engineering was selected as one of a few preferred providers of design services for one of the largest U.S. companies in the agriculture business as recently as last year. Preferred provider status is earned based on experience, personnel skill and responsiveness. This status has led to larger and more diverse projects such as plant infrastructure upgrades and improvements, new production line design and plant expansions in facility locations across the country.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2011/09/zachry-engineering-continues-design-leading-agriculture-food-beverage-companies/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry awarded expanded maintenance contract by Georgia Power Company</title>
		<link>http://www.zhi.com/2011/09/zachry-awarded-expanded-maintenance-contract-georgia-power-company/</link>
		<comments>http://www.zhi.com/2011/09/zachry-awarded-expanded-maintenance-contract-georgia-power-company/#comments</comments>
		<pubDate>Fri, 16 Sep 2011 17:52:16 +0000</pubDate>
		<dc:creator>shahp</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://www.zhi.com/?p=1011</guid>
		<description><![CDATA[Zachry Industrial, Inc. has been selected by Georgia Power Company to provide core maintenance at three plant locations: Plant Wansley and Plant Yates near Atlanta, Georgia; and Plant Scherer near Macon, Georgia. The work will be managed by Zachry’s Industrial Services Group (ISG), whose maintenance services continue at more than 90 sites nationwide. Maintenance work [...]]]></description>
			<content:encoded><![CDATA[<p>Zachry Industrial, Inc. has been selected by Georgia Power Company to provide core maintenance at three plant locations: Plant Wansley and Plant Yates near Atlanta, Georgia; and Plant Scherer near Macon, Georgia. The work will be managed by Zachry’s Industrial Services Group (ISG), whose maintenance services continue at more than 90 sites nationwide.</p>
<p>Maintenance work began in early September 2011 on the three plants, which have a combined generation capacity of 6,550 megawatts, and include one of the largest coal-fired generating stations in the nation. Georgia Power, a unit of Southern Company, has provided electricity to Georgia for more than a century.</p>
<p>“Georgia Power is an important new customer for us, and this work strategically supports our regional and power industry focus,” said General Manager Trey Thrash for Zachry. “The Southern Company is one of the premier energy companies serving the Southeast, and we look forward to a long and expanding relationship with them.”</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2011/09/zachry-awarded-expanded-maintenance-contract-georgia-power-company/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry Engineering designs Gainesville Renewable Energy Center</title>
		<link>http://www.zhi.com/2011/08/zachry-engineering-designs-gainesville-renewable-energy-center/</link>
		<comments>http://www.zhi.com/2011/08/zachry-engineering-designs-gainesville-renewable-energy-center/#comments</comments>
		<pubDate>Thu, 11 Aug 2011 14:13:21 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://zhi2.kgbtexas.com/?p=855</guid>
		<description><![CDATA[Zachry Engineering Corporation, a subsidiary of Zachry Holdings, Inc., has been selected to provide design engineering and procurement services as part of the EPC team for the Gainesville Renewable Energy Center, a 100-MW biomass power plant located in Gainesville, Fla.]]></description>
			<content:encoded><![CDATA[<p>Zachry Engineering Corporation, a subsidiary of Zachry Holdings, Inc., has been selected to provide design engineering and procurement services as part of the EPC team for the Gainesville Renewable Energy Center, a 100-MW biomass power plant located in Gainesville, Fla. </p>
<p>“Zachry Engineering has a lengthy history and a good resume in the biomass industry, and we are delighted to be providing design services to another renewable energy resource,” said Mike Morris, vice president for Zachry Engineering. “With more than 30 years of experience in a variety of renewable energy technologies, we are able to bring expertise to the application of biomass projects to support the renewable energy effort in the United States.”</p>
<p>This is the second largest biomass project Zachry has designed for the same customer, and it is the third large-scale waste wood power plant Zachry is currently designing. </p>
<p>Preliminary engineering of the power plant has been underway for several months and construction began in March 2011. Commercial operation is expected to commence in late 2013. The 100-MW biomass plant will be fueled by wood waste from urban wood refuse, harvested trees, power line and roadway clearance, and lumber mill waste. At completion, the plant is expected to create enough electricity to power 70,000 homes.</p>
<p>Several organizations have endorsed the project including the Florida Municipal Electric Association, Florida Wildlife Federation, Southern Alliance for Clean Energy, Florida Forestry Association, Gainesville Area Chamber of Commerce, Florida Farm Bureau and the Alachua County legislative delegation.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2011/08/zachry-engineering-designs-gainesville-renewable-energy-center/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Industrial Services Group awarded additional work</title>
		<link>http://www.zhi.com/2011/08/industrial-services-group-awarded-additional-work/</link>
		<comments>http://www.zhi.com/2011/08/industrial-services-group-awarded-additional-work/#comments</comments>
		<pubDate>Wed, 10 Aug 2011 22:02:24 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://zhi2.kgbtexas.com/?p=853</guid>
		<description><![CDATA[Alcoa recently awarded additional capital project services in Rockdale, Texas to Zachry Industrial, Inc., a subsidiary of Zachry Holdings, Inc. Installation of 10,000 feet of new underground water line and land reclamation in the facilities landfill area will be provided by Zachry’s Industrial Services Group.]]></description>
			<content:encoded><![CDATA[<p>Alcoa recently awarded additional capital project services in Rockdale, Texas to Zachry Industrial, Inc., a subsidiary of Zachry Holdings, Inc. Installation of 10,000 feet of new underground water line and land reclamation in the facilities landfill area will be provided by Zachry’s Industrial Services Group.</p>
<p>Zachry has provided extensive maintenance and capital support at Alcoa for more than 20 years in the power plant smelter &#038; mining operations. The additional work is a testament to the continued value that the industrial services group has provided Alcoa, the world’s leading producer of primary and fabricated aluminum. </p>
<p>“Alcoa is a valued customer,” said Steve Brauer, president of the industrial services group with Zachry. “This new project demonstrates just one of the many ways our team adds value to this site.”</p>
<p>Since 1989, Zachry has provided a variety of services including scaffold erection, insulation, carpentry, planning and scheduling, boiler turnarounds, electrical, crane operations, sandblasting, painting, fuel processing area outages and PMs, water well installation and water truck operations.</p>
<p>Small capital projects have included lignite dryer modifications, SOFA (Separate Over-Fires Air) NOx reduction, 480-volt electrical MCC change-out and swap-over, bleach and bromine system.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2011/08/industrial-services-group-awarded-additional-work/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry selected by Sempra Generation to build a nominal 150-MW solar power plant</title>
		<link>http://www.zhi.com/2011/08/zachry-selected-by-sempra-generation-to-build-234-mw-solar-power-plant/</link>
		<comments>http://www.zhi.com/2011/08/zachry-selected-by-sempra-generation-to-build-234-mw-solar-power-plant/#comments</comments>
		<pubDate>Tue, 02 Aug 2011 18:39:05 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://zhi2.kgbtexas.com/?p=848</guid>
		<description><![CDATA[Leading EPC provider, Zachry Holdings, Inc. has been selected by Sempra Generation to build one of the world’s largest solar power plants, adding 234 megawatts to the U.S. renewable fleet. Owned and operated by Sempra Generation, the Mesquite Solar Project will be located near Arlington, Arizona, and is projected to offset 200,000 tons of carbon emission each year. ]]></description>
			<content:encoded><![CDATA[<p>Leading EPC provider, Zachry Holdings, Inc. has been selected by Sempra Generation to build one of the world’s largest solar power plants, adding a nominal 150-MW solar power plant to the U.S. renewable fleet. Owned and operated by Sempra Generation, the Mesquite Solar Project will be located near Arlington, Arizona, and is projected to offset 200,000 tons of carbon emission each year. </p>
<p>Zachry will manage the installation and integration of more than 800,000 multicrystalline solar panels, providing full EPC. The project is expected to create more than 300 local jobs for construction and installation, with completion scheduled for 2013.</p>
<p>“We are excited about working with Sempra to create hundreds of green jobs and promote sustainable economic development,” said Keith Manning, executive vice president of Zachry Holdings, Inc. “This facility will provide decades of clean electricity for thousands of residents, businesses and communities.”</p>
<p>The installation is projected to annually generate about 350,000 megawatt hours of electricity, enough to power approximately 50,000 homes for a number of decades. The environmental impact of carbon emission reduction equates to the removal of 40,000 cars off the roadway or the planting of 20 million trees.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2011/08/zachry-selected-by-sempra-generation-to-build-234-mw-solar-power-plant/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry selected to build Dominion’s Warren County Project</title>
		<link>http://www.zhi.com/2011/08/zachry-selected-to-build-dominion%e2%80%99s-warren-county-project/</link>
		<comments>http://www.zhi.com/2011/08/zachry-selected-to-build-dominion%e2%80%99s-warren-county-project/#comments</comments>
		<pubDate>Mon, 01 Aug 2011 18:32:17 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://zhi2.kgbtexas.com/?p=846</guid>
		<description><![CDATA[Zachry Industrial, Inc., subsidiary of Zachry Holdings, Inc., has been selected by Dominion Virginia Power to provide turnkey EPC services in a joint venture, for their Warren County Project located in Front Royal, Virginia. The Warren County project anticipates a full notice to proceed in May 2012, with a completion in 2014.]]></description>
			<content:encoded><![CDATA[<p>Zachry Industrial, Inc., subsidiary of Zachry Holdings, Inc., has been selected by Dominion Virginia Power to provide turnkey EPC services in a joint venture, for their Warren County Project located in Front Royal, Virginia. The Warren County project anticipates a full notice to proceed in May 2012, with a completion in 2014.</p>
<p>Once built, the 3-on-1 configured, 1,300-MW combined cycle power plant will provide energy to approximately 325,000 homes. Major technology for the plant will include a Mitsubishi TC4F steam turbine, three Mitsubishi M501GAC gas turbines and dry cooling via an air-cooled condenser. </p>
<p>“Our culture and values align well with Dominion, and we are excited about the opportunity this project will bring in renewing our customer relationship,” said Randy Park, vice president for Zachry. “Our successful bid for this work was built around the depth and completeness of our EPC offering, our recent work with Mitsubishi G technology and our flourishing EPC delivery experience.”</p>
<p>As an economic stimulator to the area, the Warren County project will generate regional contract awards for certain materials and services, and will create hundreds of construction jobs. Zachry will look to their extensive employee database, giving hiring preference to former employees (including Virginia residents), as well as qualified local craft to fill available positions. </p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2011/08/zachry-selected-to-build-dominion%e2%80%99s-warren-county-project/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>ZHI’s 2010 United Way contributions top $4 million</title>
		<link>http://www.zhi.com/2011/03/zhi%e2%80%99s-2010-united-way-contributions-top-4-million/</link>
		<comments>http://www.zhi.com/2011/03/zhi%e2%80%99s-2010-united-way-contributions-top-4-million/#comments</comments>
		<pubDate>Tue, 01 Mar 2011 13:34:09 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://zhi2.kgbtexas.com/?p=833</guid>
		<description><![CDATA[Zachry Holdings, Inc. announced today that employee donations to Zachry’s 2010 United Way Campaign topped $2 million. The average employee contribution at 103 ZHI campaigns across the nation was $262.04, an increase from the 2009 $260.90 average contribution. With the dollar for dollar match Zachry provides, $4,089,472 will go to support United Way Agencies and community interests in and around 83 Zachry job site and office locations.]]></description>
			<content:encoded><![CDATA[<p><strong>SAN ANTONIO</strong> &#8211; Zachry Holdings, Inc. announced today that employee donations to Zachry’s 2010 United Way Campaign topped $2 million. The average employee contribution at 103 ZHI campaigns across the nation was $262.04, an increase from the 2009 $260.90 average contribution. With the dollar for dollar match Zachry provides, $4,089,472 will go to support United Way Agencies and community interests in and around 83 Zachry job site and office locations.</p>
<p>“Our employees continue to provide significant support to the communities where they live and work,” said Cathy Obriotti Green, vice president of community relations and special projects. “The increase in participation and average contribution — even in a time of economic downturn — clearly shows their commitment to making a difference.</p>
<p><strong>”  2010 Recognition Awarded Individual Job Sites and Offices</strong></p>
<ul>
<li> BP Texas City Job Site, Winner of the United Way of Galveston County Spirit of the Mainland Gold Award</li>
<li> Sandy Creek Power Partners Job Site, Top Employee Campaign Contributor, United Way of Waco, Texas</li>
<li> Zachry Nuclear Engineering, Winner of the 2010 Loyal Company of the Year Award for Philanthropic Leadership in Southeastern Connecticut</li>
<li> Zachry Holdings Home Office in San Antonio, Sixth Largest Contributor to United Way</li>
</ul>
<p><strong>About Zachry Holdings, Inc.</strong><br />
Zachry Holdings, Inc. is a privately held business engaged primarily in the engineering, construction, and maintenance of large industrial projects and facilities in the U.S. Based in San Antonio, Texas the company participates in a wide range of the energy sector including traditional and renewable power, petrochemical, refining, forest products and nuclear. Zachry has offices throughout the U.S. and safely employs more than 15,000 craft and professional staff.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2011/03/zhi%e2%80%99s-2010-united-way-contributions-top-4-million/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Zachry selected as contractor for FPL Cape Canaveral and Riviera Beach projects</title>
		<link>http://www.zhi.com/2011/01/zachry-selected-as-contractor-for-fpl-cape-canaveral-and-riviera-beach-projects-2/</link>
		<comments>http://www.zhi.com/2011/01/zachry-selected-as-contractor-for-fpl-cape-canaveral-and-riviera-beach-projects-2/#comments</comments>
		<pubDate>Sat, 01 Jan 2011 13:30:11 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Recent News]]></category>

		<guid isPermaLink="false">http://zhi2.kgbtexas.com/?p=829</guid>
		<description><![CDATA[Zachry Holdings, Inc. has been selected by Florida Power &#038; Light Company (FPL) to engineer and construct the Cape Canaveral and Riviera Beach Next Generation Clean Energy Centers, which together will power 500,000 homes in Florida upon completion in 2013 and 2014.]]></description>
			<content:encoded><![CDATA[<p><strong>SAN ANTONIO</strong> &#8211; Zachry Holdings, Inc. has been selected by Florida Power &#038; Light Company (FPL) to engineer and construct the Cape Canaveral and Riviera Beach Next Generation Clean Energy Centers, which together will power 500,000 homes in Florida upon completion in 2013 and 2014.<br />
 <br />
 Zachry will provide engineering and procurement services out of its Amarillo, Texas, office and provide construction services on site, creating more than 1,000 direct jobs in Florida. Zachry is scheduled to mobilize in Brevard County in February 2011 and in Palm Beach County in February 2012.<br />
 <br />
&#8220;These high-efficiency projects will deliver a true long-term impact to FPL and its 4.5 million customers. Additionally, the projects underscore our expanded integrated capabilities,&#8221; said Keith Manning, executive vice president of Zachry. “Our 50 years of experience in the power industry combined with our construction-driven engineering allows us to lead the gas market in cost-effectiveness and quality.”<br />
 <br />
The combined 2,500-MW Cape Canaveral and Riviera Beach dual-fuel modernizations will replace outdated plant elements built more than 50 years ago. The new plants will run on 33 percent less fuel per megawatt than the existing plants and are expected to save FPL customers $850 million to $950 million on their bills over the life of the plants.<br />
 <br />
“Projects of this magnitude can greatly benefit the local community as we strive to hire the majority of our workers from nearby areas,” said Steve Hoech, senior vice president of employee relations. “These projects also present an opportunity for regional vendors and subcontractors to support Zachry on a merit-shop basis.”<br />
 <br />
The 3-on-1 combined cycle plants will be the first to use the 274-MW-rated Siemens SGT6- 8000H combustion gas turbines. This technology will improve some greenhouse gas emissions on each site by 90 percent and reduce the CO2 emission rate by 50 percent. This equates to removing approximately 90,000 vehicles from roadways annually over the life of the projects.<br />
 <br />
“We are excited to be a part of such a significant program — especially with one of our longest standing customers,” Manning said. “Our current project success with FPL has given us a great understanding of the quality and detail that they expect and we look forward to a strong, continued partnership with FPL and the communities they serve.”<br />
 <br />
<strong>About Zachry Holdings, Inc.</strong><br />
Zachry Holdings, Inc. is engaged in the planning, building and renewing of the world’s most critical industrial facilities. As the largest direct-hire, merit-shop constructor in the United States, Zachry provides a range of engineering, construction and maintenance services to top industrial companies. The 85-year-old privately held organization is based in San Antonio.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zhi.com/2011/01/zachry-selected-as-contractor-for-fpl-cape-canaveral-and-riviera-beach-projects-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
